The single most common question we get after price is how long the garage will be out of action. The honest answer is that a standard garage is a multi-day job, and most of that time is curing rather than working.

Day one: preparation

Grinding, crack repair and surface making-good all happen first. On a straightforward slab this is a single day. On a floor with heavy oil contamination, significant cracking or a failed previous coating, preparation alone can take longer — which is exactly why we assess on site before committing to a schedule.

This stage is dusty and noisy. We manage the dust, but it is worth knowing in advance rather than being surprised by it.

The coats

Primer goes down first and needs to cure before the base coat follows. If you are having a flake finish, flake is broadcast into the base coat while it is still wet — there is a real working window there, which is why this part cannot be rushed or split across days.

Once the base has cured, the surface is scraped back and the protective clear top coat is applied. An Ultimate package with two premium clear coats needs cure time between them as well.

Why the waiting matters

Every one of those gaps is chemistry, not padding. Epoxy and polyurethane cure through a reaction, and applying the next coat before the one beneath is ready compromises the bond between them. A floor rushed through its cure times can look perfect on handover and delaminate months later.

Temperature affects this. Melbourne winters slow curing down; hot days speed it up and shorten working windows. We plan around the conditions on the day rather than a fixed timetable.

Walking on it versus parking on it

These are two different milestones and it matters that you know both. Light foot traffic is possible well before the floor is ready to take a vehicle. Driving on it too early — particularly turning a wheel while stationary — can mark a surface that has not reached full hardness.

We give you both dates explicitly at handover: when you can walk on it, and when you can park on it. If you have a hard deadline, tell us before we start and we will tell you honestly whether it is achievable.